|
Project Capital Cost
|
400’ pier, “wet” and “dry” board -
walks and 100’ diameter “island”
[based on current Hudson River Park
costs] |
-
Marine construction cost:
reinforced concrete pilings and structure ...
24,000sf at $300/sf
-
Adjustment for higher aquarium
loads: +$50/sf
-
Finishes: deck materials, railings,
lighting and
seating for 150 people
-
Inflation
adjustment
-
Professional fees:
allow 6%
Total |
$ 7,200,000
1,200,000
1,200,000
1,500,000
681,000
$11,781,000 |
| |
|
|
Suspension Bridge Structure
and Tower
Pavilion |
-
Cost Estimate, 5/27/07, American
Bridge Company, Fort Lee, NJ
|
$
2,395,940 |
|
Aquarium |
-
Cost Estimate, 5/27/07, BIOS
LLC, Bainbridge
Island, WA
|
$
8,434,078 |
|
Floating Dock and Ramps |
|
|
$
1,400,000 |
|
100’ Stainless Steel Sculpture,
“Ascending Arcs” |
-
Cost Estimate, 5/16/07, Polich
Tallix
Foundry, Rock Tavern, NY
|
$
1,332,500 |
|
Touch-Screen Computer System |
|
-
8-32” Commercial Touch-Screen
computers w/bright screen enhancement: cost estimate,
4/12/07, Mass Multimedia,
San Dimas, CA
-
8-glass panel kiosks with folding
doors, based on tempered
glass conservatory costs
-
20% Contingency
Total
|
$
46,472
80,000
25,000
$
151,472 |
|
Large-screen Video System
w/joystick-controlled video-camera |
-
Professional video projector
w/12’x8’ outdoor screen
-
Joystick-controlled professional
video-camera
-
15’ diameter glass enclosure,
based on costs for commercial, tempered glass
conservatories
-
15% contingency
Total |
$
11,000
40,000
25,000
15,000
$
91,000 |
| |
|
|
GRAND TOTAL
|
$ 25,585,050 |
|